# Email production capacity worksheet

FICTIONAL WORKED EXAMPLE — replace every hour before using this for a real schedule.

Window: ______ to ______. Owner of this plan: ______. Decision date: ______. Keep all hours in this same window.

## 1. Available hours by role

| Role | Assigned | Routine duties | Unavailable | Buffer | Usable = assigned − duties − unavailable − buffer | Owner / assumption |
|---|---|---|---|---|---|---|
| Copy | 20 | 8 | 2 | 2 | 8 | — |
| Design | 16 | 6 | 0 | 2 | 8 | — |
| Localization | 10 | 2 | 0 | 2 | 6 | — |
| Review / QA | 12 | 4 | 0 | 2 | 6 | — |

## 2. Estimated demand by send

| Send / version | Copy | Design | Localization | Review / QA | Dependency / due date | Decision |
|---|---|---|---|---|---|---|
| A — newsletter | 4 | 3 | 2 | 2 | Approved article URL | Conditional schedule |
| B — invitation | 3 | 2 | 2 | 2 | Live registration page | Conditional schedule |
| C — segmented variant | 4 | 2 | 3 | 3 | Approved segment rule | Defer |
| Total demand | 11 | 7 | 7 | 7 | — | — |
| Gap = usable capacity − demand | -3 | 1 | -1 | -1 | — | — |
| Demand after deferring C | 7 | 5 | 4 | 4 | — | — |
| Capacity remaining after deferring C | 1 | 3 | 2 | 2 | — | — |

## 3. Blank planning tables

| Role | Assigned | Routine duties | Unavailable | Buffer | Usable = assigned − duties − unavailable − buffer | Owner / assumption |
|---|---|---|---|---|---|---|
| Copy | ____ | ____ | ____ | ____ | ____ | ____ |
| Design | ____ | ____ | ____ | ____ | ____ | ____ |
| Localization | ____ | ____ | ____ | ____ | ____ | ____ |
| Review / QA | ____ | ____ | ____ | ____ | ____ | ____ |

| Send / version | Copy | Design | Localization | Review / QA | Dependency / due date | Decision |
|---|---|---|---|---|---|---|
| ______ | ____ | ____ | ____ | ____ | ______ | ______ |
| ______ | ____ | ____ | ____ | ____ | ______ | ______ |
| ______ | ____ | ____ | ____ | ____ | ______ | ______ |
| ______ | ____ | ____ | ____ | ____ | ______ | ______ |
| ______ | ____ | ____ | ____ | ____ | ______ | ______ |
| ______ | ____ | ____ | ____ | ____ | ______ | ______ |

## 4. Decision prompts

- Which role has a negative gap, and who owns that work?
- Can the work finish in sequence before the proposed send, including a real review window?
- Which send or variant will be simplified, moved or deferred, and what is the revised estimate?
- Who can hold the send if a fact, destination or approval is late?

The example hours are invented. Do not copy them as staffing targets; agree your own estimates and buffer with the people doing the work. Spare hours in one role are not automatically transferable to another.